The results to be achieved within the project are:

– 1 (one) Report on the socio-economic characteristics of the territory where the site of community importance ROSCI0097 Lacul Negru together with the nature reserve 2.813 Lacul Negru – Cheile Nărujei I are located, necessary to substantiate the Management Plan, elaborated
– 1 (one) Study on the abiotic environment and the types of land ownership on the targeted site of community importance, including 1 (one) map with the types of land ownership on the targeted site of community importance and a map for each aspect of the abiotic environment on the targeted site of community importance (geological map, pedological map, hydrographic map etc.)
– 1 (one) Study on the inventory and mapping of wild species of community interest and habitats of community interest from the site of community importance ROSCI0097 Lacul Negru together with the nature reserve 2.813 Lacul Negru – Cheile Nărujei I, including 5 (five) maps on the distribution of wild species of community interest and 4 (four) maps on the distribution of habitats of community interest on the site, necessary to substantiate the Management Plan, elaborated
– 1 (one) Study on the evaluation of activities with potential anthropic impact on the site of community importance ROSCI0097 Lacul Negru together with the nature reserve 2.813 Lacul Negru – Cheile Nărujei I, including 1 (one) location map on the anthropic activities with potential impact on the site of community interest targeted, necessary to substantiate the Management Plan
– 1 (one) Study on current and potential threats on species and habitats of community interest on the targeted site, necessary to substantiate the Management Plan
– 1 (one) Study on the management measures proposed to maintain or improve the conservation status of wild species of community interest and habitats of community interest on the site of community importance ROSCI0097 Lacul Negru together with the nature reserve 2.813 Lacul Negru – Cheile Nărujei I, necessary to substantiate the Management Plan
– 1 (one) Study / Plan on the methodologies and protocols for monitoring the conservation status of habitats and species of community interest on the site of community importance ROSCI0097 Lacul Negru together with the nature reserve 2.813 Lacul Negru – Cheile Nărujei I, necessary to substantiate the Management Plan
– 1 (one) functional geospatial database, necessary to revise / update the Management Plan, elaborated
– 1 (one) revised / updated Management Plan
– 1 (one) elaborated / harmonized site regulation
– 1 (one) SEA study elaborated and approved according to current legislation, including the approval of the Management Plan
– 2 (two) awareness and public consultation meetings with the stakeholders (local communities, NGOs for environmental protection, grassland owners, representatives of the local public administration) at the stage of revising / updating the Management Plan, organized
– 2 (two) awareness and public information meetings (local communities, NGOs for environmental protection, grassland owners, representatives of the local public administration) regarding the provisions of the Management Plan, organized
– 1 (one) meeting with the authorities with relevant attributions, organized
– 1 (one) web page (Romanian-English) created within the project as well as its sustainability, ensured by the custodian for at least 5 years after the end of the project
– 1 (one) Facebook page, created and updated
– minimum 5 (five) media partnerships established
– 10 (ten) presentations in schools with minimum 200 student participants, organized
– 10 (ten) thematic trips with minimum 110 participants in total, organized
– 2 (two) seminars / presentations with minimum 20 participants, organized
– 2 (two) infopoints with minimum 100 visitors, organized
– 2 (two) short films of advertising type (maximum 2 minutes), produced and broadcasted
– 2 (two) press releases (one at the beginning, one at the end of the project, in local / regional newspapers of highest circulation), published
– 2 press conferences (1 conference to launch the project and 1 conference to conclude the project and present the results) organized
– 2 polls conducted (before and after the awareness campaign – each performed on 1 sample of 100 people) and 2 research reports for the polls (before and after the awareness campaign)
– 1 functional PIU (Project Implementation Unit)
– 2 (two) audit reports elaborated
– 2 training sessions, 1 mixed training session – theory and practice – 10 hours of theory and 80 hours of practice on the topic: implementation of the Management Plan and 1 theoretical training session – 30 hours of theory on the topic: the use of GIS, realized
– 7 trained representatives belonging to the custodian
– equipment to increase administrative capacity
– 1 (one) contract of consultancy services for the elaboration of the financing application and the Acquisition Documentation related to the contracts following the Financing Contract, signed